NEC box fill calculator

Box fill is the minimum volume a box needs for what's inside it. Add a volume allowance from Table 314.16(B)(1) for every conductor, device, clamp set, fitting type, ground group and terminal block, then compare the total with the box volume1. A 4 in square box 2-1/8 in deep holds 30.3 in³; six 12 AWG conductors, one receptacle and two grounds need 20.25 in³, so it fits.

By , founder of AmpCount. Values from the 2023 NEC (NFPA 70), checked . Check which edition your jurisdiction enforces. A calculator doesn't replace the engineer of record or the inspector.

Insulated conductors entering or passing through, by size
Required20.25 in³
Box30.30 in³

Fits, with 10.05 in³ to spare.

ItemCounts asin³
Conductors6 × 12 AWG13.50
Device yokes (2 each)2 × 12 AWG4.50
Equipment grounds (up to 4 count as 1)1 × 12 AWG2.25

Smallest standard boxes that fit: 4 x 1-1/2 square (21 in³), 3-3/4 x 2 x 3-1/2 masonry box or gang (21 in³), 4 x 2-1/8 round or octagonal (21.5 in³).

Volume allowance per conductor

NEC Table 314.16(B)(1)21
Conductor size18 AWG16 AWG14 AWG12 AWG10 AWG8 AWG6 AWG
Volume, in³1.501.752.002.252.503.005.00

How each item counts in the 2023 NEC

ItemCounts asSection1
Conductor from outside the box, spliced, terminated or passing through1 each, at its own size314.16(B)(1)
Unbroken loop or coil at least twice the minimum length in 300.14 (12 in or more)2, at its size314.16(B)(1)
Conductor no part of which leaves the box (pigtail, jumper)0314.16(B)(1)
Grounds and up to four fixture wires smaller than 14 AWG from a domed luminaire canopyMay be left out314.16(B)(1) Exception
Internal cable clamps, any number1, at the largest conductor in the box314.16(B)(2)
Support fittings (luminaire studs, hickeys)1 per type, at the largest conductor314.16(B)(3)
Device on a yoke or strap2, at the largest conductor connected to it; 2 per gang if wider than a 2 in device box314.16(B)(4)
Equipment grounding conductorsUp to 4 count as 1, at the largest ground; each additional one counts 1/4314.16(B)(5)
Terminal block assembly1 each, at the largest conductor terminated to it314.16(B)(6), new in 2023

Two changes catch people working from older references: since the 2023 edition, terminal blocks get their own allowance, and the grounding conductor rule no longer mentions equipment bonding jumpers.1

Standard metal box volumes

NEC Table 314.16(A), volume in cubic inches21
Box, trade size in inchesin³Max 12 AWGMax 14 AWG
4 x 1-1/4 round or octagonal12.556
4 x 1-1/2 round or octagonal15.567
4 x 2-1/8 round or octagonal21.5910
4 x 1-1/4 square18.089
4 x 1-1/2 square21.0910
4 x 2-1/8 square30.31315
4-11/16 x 1-1/4 square25.51112
4-11/16 x 1-1/2 square29.51314
4-11/16 x 2-1/8 square42.01821
3 x 2 x 1-1/2 device7.533
3 x 2 x 2 device10.045
3 x 2 x 2-1/4 device10.545
3 x 2 x 2-1/2 device12.556
3 x 2 x 2-3/4 device14.067
3 x 2 x 3-1/2 device18.089
4 x 2-1/8 x 1-1/2 device10.345
4 x 2-1/8 x 1-7/8 device13.056
4 x 2-1/8 x 2-1/8 device14.567
3-3/4 x 2 x 2-1/2 masonry box or gang14.067
3-3/4 x 2 x 3-1/2 masonry box or gang21.0910
FS single cover/gang13.566
FD single cover/gang18.089
FS multiple cover/gang18.089
FD multiple cover/gang24.01012

The maximum columns divide the volume by the allowance with nothing else in the box. Nonmetallic boxes and boxes not in the table are marked with their volume by the manufacturer; use the marked number, and add the marked volume of any plaster ring, extension ring or raised cover.

Box fill in the estimate

Box fill shows up in a bid at multi-device locations, where two or three devices on 12 AWG push a standard box into a deeper box or a 4-11/16 in box with a ring. Those boxes cost more and take longer to set, so they're worth catching at takeoff rather than on site. Counting how many of those locations a job has starts with the device count; that's what AmpCount does from the plans, and the electrical takeoff guide covers the rest of the process.

On paper, give the oversized boxes their own row on the takeoff sheet instead of folding them into the device count, so the box, the ring and the extra labor each get priced. Those rows then carry into the electrical estimate calculator with a labor unit that reflects the bigger box.

Box fill is the last of three related checks. When a box is fed by a raceway, the same conductors have to fit the pipe first, which is what the conduit fill calculator checks. If a long run was upsized after a voltage drop check, run the box again at the new wire size: going from 12 to 10 AWG raises the allowance from 2.25 to 2.50 in³ per conductor. For where these details sit in the whole bid, see the guide to electrical estimating.

More calculators and guides

Sources

  1. NFPA 70 revision cycle, Code-Making Panel 8 public input responses (quotes the 2023 text of 314.16)
  2. NFPA 70, National Electrical Code, 2023 edition (read online at nfpa.org)

NFPA 70 and National Electrical Code are registered trademarks of the National Fire Protection Association. AmpCount is not affiliated with NFPA.